Wednesday, 13 March 2013

The external fabric of the dwellings is now complete, and the scaffold is due to be dismantled from Thursday 14th March.

Monday, 4 March 2013

Metal Frame studs to form ceiling void.


Externally, the doors have been installed with the superstructure brickwork now fully complete.