With the roofs complete, each section is then lifted down allowing the timber frame joiners to erect and fix the first floor timber wall panels. Once complete the roof is then lifted and fixed into position.
With the timber frame superstructure complete, the roofers begin to lath, felt and load out the roof.
The roof is tiled and windows are installed, now the internal works can commence, beginning with the plaster boarding.
No comments:
Post a Comment
Note: only a member of this blog may post a comment.